WATER UPCYCLING BOTANICAL PARK

BOTTLE BEACH

A Landmark Ecological Proposal by BIOSPHERE X AQUASAI

Client: PRIVATE, Bottle Beach, Koh Phangan | Date: July 2, 2025

Project Vision

This proposal outlines the design and construction of a full-scale **Water Upcycling Botanical Park**. This is not merely a utility; it is a landmark living ecosystem engineered to become a central feature of the resort. It will intercept and biologically transform 100% of the resort's wastewater into a source of life for a series of lush water gardens. The system integrates a final UV light treatment stage for tertiary polishing, ensuring the highest quality recycled water. This project will eliminate all pollution, create a water-secure and resilient resort, and establish a new global benchmark for regenerative tourism.

Full-Scale Design & Sizing

0
Design Load (Persons)
0
Daily Water Upcycled (Liters)
0
Botanical Park Area (m²)
0
Bio-Filtration Media (m³)

Investment Outline (Full Development)

Component Description Cost (THB) Cost (USD)
Design & Engineering Full hydraulic, civil, and botanical design for large-scale system. ฿ 450,000 $ 12,300
Site Prep & Earthworks Land clearing and excavation for the 1,000 m² wetland cells. ฿ 500,000 $ 13,700
Primary Treatment System 75,000 L multi-chamber primary settling system. ฿ 1,200,000 $ 32,900
Wetland Containment High-quality, durable impermeable liner (EPDM/HDPE). ฿ 1,500,000 $ 41,100
Bio-Filtration Media 750 m³ of washed gravel and sand layers. ฿ 1,500,000 $ 41,100
Plumbing & Connections Extensive piping network for entire resort. ฿ 600,000 $ 16,400
Botanical Layer Native wetland plants for 1,000 m² area. ฿ 375,000 $ 10,300
Labor & Installation Skilled and unskilled labor for full construction. ฿ 1,600,000 $ 43,800
Water Reuse System High-capacity pump, large storage tanks, and distribution. ฿ 375,000 $ 10,300
UV Light Treatment System Commercial-grade UV disinfection unit for tertiary polishing. ฿ 500,000 $ 13,700
Subtotal ฿ 8,600,000 $ 235,600
Contingency (15%) ฿ 1,290,000 $ 35,400
Total Estimated Investment ฿ 9,890,000 $ 271,000

Funding & Partnership Strategy

A Pathway to a Funded Project

We understand that this represents a significant investment. However, a project of this nature—demonstrating innovation in sustainable tourism, water conservation, and ecological restoration—is highly attractive to a variety of international and national grant-making bodies. The total project cost can be substantially offset through these programs.

AquaSai provides expert guidance in navigating the complex landscape of environmental and sustainable development grants. Our partnership extends beyond construction to help identify, apply for, and secure funding from sources including:

  • International Environmental Conservation Funds
  • National Sustainable Tourism Development Grants
  • Private Philanthropic Foundations focused on Ocean Health
  • Corporate Social Responsibility (CSR) Partnerships
Explore Grant Opportunities with AquaSai

Project Timeline (Full Development)

Phase 1: Design, Permitting & Grant Application

Weeks 1-6

Phase 2: Procurement & Logistics

Weeks 7-10

Phase 3: Earthworks & Construction

Weeks 11-22

Phase 4: Planting & System Seeding

Weeks 23-24

Phase 5: Commissioning & Monitoring

Weeks 25-28

Strategic Value & Return

Ecological Restoration

Permanently protects the coral reef by eliminating all nutrient pollution, reversing eutrophication, and securing the resort's primary natural asset for generations to come.

Water Independence

Creates 18.25 million liters of high-quality recycled water per year, ensuring total water security and resilience against drought and climate change.

A Destination Feature

The Botanical Park becomes a unique, beautiful, and educational attraction, enhancing the guest experience and providing a powerful storytelling asset for the resort.

World-Class Branding

Establishes the resort as a global leader in regenerative tourism, attracting high-value, eco-conscious travelers and generating significant positive press.

Operational Resilience

Future-proofs the entire resort against stricter environmental regulations, water scarcity, and rising operational costs, turning a liability into a productive asset.

Project Assumptions

  • The resort will provide the required land area (~1,200 m²) for the system at no cost.
  • The estimate assumes reasonable soil conditions and access for construction machinery.
  • Costs for long-term operational maintenance (e.g., plant trimming, UV lamp replacement) are not included.
  • Costs for major landscaping features (e.g., boardwalks, lighting) are not included but can be quoted separately.